Facilities installed by Rea Ltd will enable handling of bulk ore cargoes, scrap iron, etc, at high speeds; rebuilding of quay and rearrangement and extension of railway sidings were involved; important aspect is installation of two 20-ton level luffing cranes with associated traveling weighing and vehicle loading equipments.
Modernisation of Cavendish Quay, Birkenhead
Engineer
Engineer ; 218 , n 5683
1964
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
SLUB | 2011
|SLUB | 2014
|Birkenhead corporation electric tramways
Engineering Index Backfile | 1901
YANKEE IRONCLADS AT BIRKENHEAD?
Taylor & Francis Verlag | 1981
|Cammell Laird's shipyard reconstruction at Birkenhead
Tema Archiv | 1978