Facilities for rapid coaling of steam trawlers provided by London Midland and Scottish Railway, comprise installation of series of six independent electrically operated coaling plants, with individual capacity of 200 tons per hr, specially adapted for dealing with fishing vessels, and replace coaling either by steam cranes and buckets, or by three electrically driven transporter cranes. (See also Ry Gaz v 67 n 10 Sept 3 1937 p 396-7; Engineering v 144 n 3738 Sept 3 1937 p 253-5)
Improved trawler bunkering facilities at fleetwood
Engineer
Engineer ; 164 , n 4260
1937
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Improved trawler bunkering facilities at fleetwood
Engineering Index Backfile | 1937
Ship bunkering facilities for cargo pier
Engineering Index Backfile | 1960
|BUNKERING SYSTEM BUNKERING SHIP AND LIQUEFIED GAS BUNKERING STATION
Europäisches Patentamt | 2020
|BUNKERING SYSTEM BUNKERING SHIP AND LIQUEFIED GAS BUNKERING STATION
Europäisches Patentamt | 2023
LNG Performance test facilities of LNG bunkering appliances
Europäisches Patentamt | 2020
|