Factors in roadway and track construction and maintenance which must be given special consideration to permit economical and comfortable high speed operation with greatest degree of safety; importance of properly designed power to economical track maintenance; studies and tests made, and measures taken on Pennsylvania railroad in interest of stronger, more stable, and smoother riding track structure.
High-speed service demands higher track standards
Ry Eng Maintenance
Railway Engineering and Maintenance ; 33 , n 7
1937
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Speed in freight service demands horsepower
Engineering Index Backfile | 1940
Effective track-welding demands careful planning
Engineering Index Backfile | 1936
Economical track maintenance demands clean ballast
Engineering Index Backfile | 1934
|What high-speed service means to track man
Engineering Index Backfile | 1941
|High-Speed Trains Operation Demands Extreme High Quality
British Library Online Contents | 1995
|