Commentary on rehabilitation of 1433 ft of double track (2866 ft of equivalent single track) on Peachtree Street, Atlanta, which was carried out under heavy traffic.
Difficult track rebuilding job
Mass Transportation
Mass Transportation ; 33 , n 11
1937
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Rebuilding track at limited cost
Engineering Index Backfile | 1930
|Engineering Index Backfile | 1929
|Engineering Index Backfile | 1929
|Rebuilding track amid traffic congestion
Engineering Index Backfile | 1925
|Rebuilding street railway track at Cincinnati
Engineering Index Backfile | 1928