Highway bridge consisted of ten lattice girder spans, each 328 ft long; four of ten spans were destroyed, but piers remained intact; four wrecked spans were repaired by temporarily transferring two of intact curved top chord truss spans of railway bridge to highway structure; railway bridge was 4650 ft long; 6 to 14 spans were destroyed; it is proposed to shorten railway bridge from 14 to 10 spans, four demolished spans being replaced by earth dyke, 1500 ft long.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Rebuilding Moerdijk bridges, Holland


    Weitere Titelangaben:

    Engineer


    Erschienen in:

    Engineer ; 182 , n 4725


    Erscheinungsdatum :

    1946


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :