According to announcement issued by South African Railways and Harbors Administration, East Londons' graving dock, under construction for greater part of war period, will come into commission this year; port will have 683 ft of new landing quay, with depth of water of 30 ft at low tide, and 650 ft of repair quay with dredged depth of 35 ft at low water; graving dock, which will be able to accommodate ships up to 17,000 tons, is 723 ft long, 102 ft 3 in. wide, and 32 ft 6 in. deep at low tide.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Port of East London


    Weitere Titelangaben:

    Dock Harbour Authority


    Erschienen in:

    Erscheinungsdatum :

    1946


    Format / Umfang :

    2 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Port of east London

    Engineering Index Backfile | 1948


    Waterfront development : Durban, East London, Port Elizabeth - Success or failure?

    Loubser, H. J. | British Library Online Contents | 1997



    Port of London

    Ordman, N.N.B. | Engineering Index Backfile | 1952


    Port of London

    Engineering Index Backfile | 1917