Modern methods employed in laying petroleum pipe lines through primeval forests of Sumatra; pipe line consists of seamless steel pipe with electrically welded joints; total of 23,736 pipe sections were laid; 268-km line is buried 70 cm underground; method of construction, protective coatings, etc, described. (see also Foerdertechnik v 30 n 16 Aug 4 1937 p 329-35)
Modern methods employed in laying petroleum pipe lines through primeval forests of Sumatra