During rebuilding of street railway in Detroit, Mich, cars ran over temporary tracks laid directly on pavement; connection between permanent and temporary tracks was achieved by means of California type switches; new rails are all-welded-joint rails; operations are fully mechanized; job is progressing at rate of 300 ft per day; step-by-step details are shown.