Project is in detail-design stage with most major procurements under contract and equipment design and subsystem development tests proceeding on schedule at subcontractors' facilities; extensive integrated system testing will begin with arrival of first equipment at Lunar Excursion Module (LEM) prime contractor, Grumman Aircraft Engineering Corp; spacecraft weight has been reduced by design optimization so that current LEM design offers adequate margin for future weight growth.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Technical development status of project Apollo lunar excursion module


    Weitere Titelangaben:

    SAE -- Paper


    Beteiligte:
    Kelly, T.J. (Autor:in)

    Kongress:

    1964 Lunar



    Erscheinungsdatum :

    1964


    Format / Umfang :

    27 pages


    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :