First section of new electrified Motspur Park-Chessington-Leatherhead branch opened May 29, with Tolworth as temporary terminus; diagram showing details of cutting construction and drainage, and of embankment; telescopic method of construction used; notes on earthworks, bridge work, fencing and permanent way, stations and station yards, station lighting and yard layouts, distribution of work, and operation.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    New southern railway suburban line


    Weitere Titelangaben:

    Ry Gaz


    Erschienen in:

    Railway Gazette ; 68 , n 21


    Erscheinungsdatum :

    1938


    Format / Umfang :

    7 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    New southern railway suburban line

    Engineering Index Backfile | 1938



    Suburban electrification on the southern railway

    Engineering Index Backfile | 1925


    Cincinnati street railway opens suburban line

    Engineering Index Backfile | 1931


    Suburban railway electrification

    Say, M.G. / Smith, S.P. | Engineering Index Backfile | 1928