Comparative discussion of following routes: Dossor-Stalingrad, on Volga, 640 km., Dossor-Saratov, on Volga, 667 km., Dossor-Samara, on Volga, 670 km.; and Dossor-Aktyubinsk on Orenburg-Tashkent railroad, 442 km.; author favors last-mentioned route for main pipe line with capacity of 2 1/2 million tons per annum, in contrast with Russian government plan for 2-million-ton pipe line to Volga and half-million-ton line to Aktyubinsk.
Selection of alignment for the emba petroleum pipe line
Azerbayjanskoye Nephtyanoye Khozyaistvo
1930
10 pages
1 Fig.
Aufsatz (Zeitschrift)
Russisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Profiel Emba Techniek groep NV
British Library Online Contents | 1993
DCM-Emba brings a little US to EU
British Library Online Contents | 2007
TERMINAL AUTOMATION - DCM-Emba brings a little US to EU
Online Contents | 2007
The present and the future of line pipe steels for petroleum industry
Tema Archiv | 2010
|