In 1927 government of Costa Rica commissioned A.E.G. to electrify State Railway network, Ferrocarril al Pacifico, for total distance of 80 miles, with single-phase system at trolley-wire voltage of 15, 000 volts, 20 cycles; date of completion was fixed for end of May 1930; railroad connects capital of San Jose with seaport Puntarenas; greatest altitude is 3850 ft. above sea level; maximum gradient is 2.5 per cent. (English Edition)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Electrification of the State Railway in Costa Rica


    Weitere Titelangaben:

    AEG Progress


    Erschienen in:

    Erscheinungsdatum :

    1929


    Format / Umfang :

    7 pages


    Anmerkungen:

    13 Figs.


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch




    Electrification of Costa Rica state railway

    Engineering Index Backfile | 1934


    Railways of Costa Rica

    Engineering Index Backfile | 1943


    Swedish state railway electrification

    Engineering Index Backfile | 1933



    State Railway electrification in Italy

    Engineering Index Backfile | 1931