Methods of roadbed drainage; permanent roadbed; weed killing; specifications for cast-iron pipe, corrugated iron and other types of metal culverts; use of highway crossing plank and substitutes therefor; clearances; deformation of roadbed. (Daily Edition) (See also - discussion p 628-D84 -- 628-D85; Am. Ry. Eng. Assn. -- Bul., vol. 31, no. 321, Nov. 1929, pp. 599-658, 8 figs.)
Report of committee on roadway
Ry. Age
Railway Age ; 88 , n 10
1930
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1921
Report of committee on roadway
Engineering Index Backfile | 1930
Report of committee I -- Roadway
Engineering Index Backfile | 1936
Report of committee -- I -- Roadway
Engineering Index Backfile | 1934
Report of Committee I -- Roadway
Engineering Index Backfile | 1931