Jan 3 n 1 p 16-17: Methods in use in India; Neale's token instruments; rules for working single lines; Theobald's key. Jan 10 n 2 p 59-60: Indian requirements as to token instruments. Jan 17 n 3 p 84-85: How double line of railway can, with single-line methods of operation, be made almost equivalent of four tracks; unidirectional single-line method. Jan 24 n 4 p 129: How uni-directional relief line can be converted into one available for traffic in either direction. Jan 31 n 5 p 160-161: Installation wherein are to be found all features of modern token working; features of signaling layout and equipment on Maltby-Tickhill line, South Yorkshire Joint Railway. Feb 7 n 6 p 194-195: Question of control of signal for entering section by token for section; benefits of token control; little done with starting signal control. Feb 21 n 8 p 270-271: Advantages of non-token system; Sykes non-token system. Mar 7 n 10 p 348-349: Sykes non-token instrument and methods of working. Apr 11 n 15 p 553-554: S.Y.X. single-line lock and block system. (See also - vol. 51 no. 26 Dec 27 1929 pp. 1002-1003)
The operation of single lines of railway
Ry. Gaz.
Railway Gazette ; 52 , n 1-6, 8, 10, 15
1930
17 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
The operation of single lines of railway
Engineering Index Backfile | 1929
The operation of single lines of railway
Engineering Index Backfile | 1929
Railway lines operation simulator: GifTren
British Library Conference Proceedings | 2000
|Effect of railway lines on telegraph operation
Engineering Index Backfile | 1926
|Innovative Operation Control Technique for Secondary Railway Lines
British Library Conference Proceedings | 1998
|