General Railway Signal Co. has placed in service centralized control system between Edgewater junction, Kansas City, Kan. and Atchison; from 40 to 50 trains handling daily all movements being directed by signal indication; track and signal plan of centralized signal control territory from Edgewater junction to Atchison on Missouri Pacific. (See also Ry. Signaling vol. 23, no. 3, Mar. 1930 pp. 98-101, 5 figs)
Centralized signal control
Ry. Age
Railway Age ; 88 , n 11
1930
3 pages
3 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1930
Centralized control of metropolitan signal system
Engineering Index Backfile | 1962
|Pere Marquette installs centralized control signal system
Engineering Index Backfile | 1928
Pere Marquette installs centralized control signal system
Engineering Index Backfile | 1928