Practicability of using remote control facilities on busy double-track line, controlled in conjunction with existing interlockings demonstrated by Pennsylvania on installation on Ft. Wayne division between Vandale, Ind., and Berlin, 10-mi. section of double track, involving four passing tracks and one crossover, as well as signals for directing train movement in this area.
Pennsylvania uses remote control for switches
Ry. Signaling
Railway Signaling ; 23 , n 3
1930
2 pages
5 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Remote control on Pennsylvania
Engineering Index Backfile | 1937
Remote control on Pennsylvania
Engineering Index Backfile | 1936
Remote control interlockings on Pennsylvania
Engineering Index Backfile | 1938
Remote control of switches and signals
Engineering Index Backfile | 1931
|How Pennsylvania railroad uses X-ray inspection
Engineering Index Backfile | 1949
|