With new combined line-and-recording method, known as CLR all calls are routed to operators who must themselves be able to reach all outgoing toll lines; in larger cities, however, it is not possible to have all toll lines appear in multiple before each CLR operator, so that toll tandem board containing all toll multiple has been developed; board acts as central point in toll office through which operators may secure additional circuits.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Toll tandem switchboard


    Weitere Titelangaben:

    Bell Laboratories Rec


    Beteiligte:
    Hokanson, C.E. (Autor:in)

    Erschienen in:

    Erscheinungsdatum :

    1930


    Format / Umfang :

    4 pages


    Anmerkungen:

    4 Figs.


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    3B toll switchboard

    Greene, J.C. | Engineering Index Backfile | 1939


    Toll switchboard no. 6

    Allison, S.W. | Engineering Index Backfile | 1947


    Modern switchboard practice

    Davis, H.P. | Engineering Index Backfile | 1902


    SWITCHBOARD INSTALLATION METHOD

    TANANO NAOYUKI | Europäisches Patentamt | 2024

    Freier Zugriff

    Navy switchboard instruments

    Gillette, C.S. | Engineering Index Backfile | 1923