Design and shopping procedure changes were made to Class E-4 heavy 4-6-4 passenger locomotives; six of nine in group received new welded boilers, all were converted to oil burners, and procedure was instituted for laying out frame and running gear with transit; general wear data; results of transit layout. (See also Ry Age v 127 n 20 Nov 12 1949 p 834-7)
Cost of modernizing locomotives repaid in 3 years
Ry Mech Engr
Railway Mechanical and Electrical Engineer ; 123 , n 12
1949
6 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Cost of modernizing locomotives repaid in 3 years
Engineering Index Backfile | 1949
Engineering Index Backfile | 1917
Modernizing locomotives on the Kansas City southern
Engineering Index Backfile | 1915
Report of committee on modernizing of existing locomotives
Engineering Index Backfile | 1916
Put your trust in homeworkers and be repaid
British Library Online Contents | 2003
|