Production planning and assembling methods at plant of Peerless Motor Car Corp.; materials-control system for making 720 different cars within processing time of 96 hr.; blank form used in recording nature and reasons for engineering changes in product; cost control. (See also - no. 7 Feb. 12, 1931, pp. 533-538 and 564)
Turnover of 30 times A year through mastered control
Iron Age
Iron Age ; 127 , n 8 ; p 613-616
1931
4 pages
3 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
DESIGNER'S NOTEBOOK - Digitally mastered mamtenance for avionics
Online Contents | 1993
Quality as an indicator of mastered processes
Kraftfahrwesen | 1987
|AIR TRANSPORT - Korean wants higher profile, having mastered basics
Online Contents | 2004