In plant of London and North-Eastern Railway Co. engines can be put in service again in half time previously required; two tanks, of 15, 000 and 20,000 gal. capacity, for washing-out water and for refilling water are served by horizontal duplex compound Worthington steam pumps. (Partly on p. 628) (See also Engineer vol. 152, no. 3958, Nov. 20, 1931 pp. 553, 1 fig; and Engineer, vol. 132, no. 3436, Nov. 20, 1931, pp. 653-654, 1 fig.)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Locomotive boiler washing plant at Stratford


    Weitere Titelangaben:

    Ry. Gaz


    Erschienen in:

    Erscheinungsdatum :

    1931


    Format / Umfang :

    2 pages


    Anmerkungen:

    3 figs.


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Approved method of locomotive boiler washing

    Engineering Index Backfile | 1916


    Reducing frequency of locomotive boiler washing-out operations

    Richter, H. | Engineering Index Backfile | 1936


    Locomotive boiler

    Brandt, C.A. | Engineering Index Backfile | 1940


    Locomotive boiler

    Engineering Index Backfile | 1894


    Locomotive Boiler Explosions

    Hewison, C. H. | TIBKAT | 1983