Recent installations reduced amount of extra labor and improved train operation during severe blizzard in Chicago; oil-burning snow melters; snow melting with weed burners; Union Station increases installation; other snow-melting methods.
Snow-melting equipment saves the day
Ry. Eng. Maintenance
Railway Engineering and Maintenance ; 27 , n 4
1931
3 pages
5 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1945
|