This railway bridge crosses the river five miles from its mouth, where it is subject to very high tides. The conditions are described in an illustrated description of the substructure work given. (4300 w.)
Substructure work and erection of the shubenacadie bridge
Eng Rec
1904
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Erection of the substructure of the Pennsylvania terminal post office
Engineering Index Backfile | 1910
Kenova bridge channel span erection
Engineering Index Backfile | 1920