Features of various designs for single-track railroad bridge 538 m. long; steel-arch, steel-truss, and suspension types of design are described.
Competitive preliminary design for bridge over Rhine river near Speyer
Skizzenwettewerb fuer eine Rheinbruecke bei Speyer
Zentralblatt der Bauverwaltung ; 49 , n 22
1929
8 pages
22 Figs.
Aufsatz (Zeitschrift)
Deutsch
© Metadata Copyright Elsevier B. V. All rights reserved.
Reconstruction of railway bridge over Rhine River between Chalampe and Neuenburg
Engineering Index Backfile | 1946
|Railway bridge over Rhine at Spyck
Engineering Index Backfile | 1945
Engineering Index Backfile | 1925
|Construction of new railroad bridge over the Rhine at Ragaz
Engineering Index Backfile | 1928
|Engineering Index Backfile | 1945
|