Description of building yards laid out by Upper Hasli Hydroelectric Co., Switzerland; materials and machinery were transported by special railway about 5 km. long, and thence to work yards by a telpher 18 km. long; for transport to Gelmer, there is 1000-m. cable.
Installations for construction of Grimsell and Gelmer dams
Cenno sulle installazioni per la costruzione delle dighe del Grimsel e di Gelmer
Energia Electrica ; 6 , n 2 ; p 149-157
1929
9 pages
12 Figs.
Aufsatz (Zeitschrift)
Spanisch