Description of building yards laid out by Upper Hasli Hydroelectric Co., Switzerland; materials and machinery were transported by special railway about 5 km. long, and thence to work yards by a telpher 18 km. long; for transport to Gelmer, there is 1000-m. cable.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Installations for construction of Grimsell and Gelmer dams


    Weitere Titelangaben:

    Cenno sulle installazioni per la costruzione delle dighe del Grimsel e di Gelmer


    Beteiligte:
    Bordoni, A. (Autor:in)

    Erschienen in:

    Energia Electrica ; 6 , n 2 ; p 149-157


    Erscheinungsdatum :

    1929


    Format / Umfang :

    9 pages


    Anmerkungen:

    12 Figs.


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Spanisch


    Schlagwörter :


    Exploiting existing dams for solar PV system installations

    Kougias, Ioannis | Online Contents | 2016


    Construction Specification Framework for Utility Installations

    Quiroga David/Ford Timothy/Taylor Stanley/Kranc, Cesar | Online Contents | 2008



    Construction Specification Framework for Utility Installations

    Quiroga, Cesar / Ford, David / Taylor, Timothy et al. | Transportation Research Record | 2008


    Offshore installations : guidance on design and construction

    Großbritannien, Department of Energy | TIBKAT | 1984