Features of new waterway to sea and new port; details of port facilities; use of caissons (40 m. long, 10 m. wide, 11.5 m. high) for pier construction; improvement of foundations, course of construction; total cost 2,300,000 florins. (French translation) (See also Ingenieur vol. 44, no. 1, Jan. 5, 1929 pp. B1-B8, 9 figs)
New cargo-handling facilities of the port of Dordrecht
Een nieuwe los en laadinrichting voor massagoederen in de zeehaven te Dordrecht
Genie Civil ; 95 , n 13
1929
2 pages
3 Figs.
Aufsatz (Zeitschrift)
Französisch
© Metadata Copyright Elsevier B. V. All rights reserved.
New cargo-handling facilities of the port of Dordrecht
Engineering Index Backfile | 1929
|New cargo-handling equipment of seaport Dordrecht
Engineering Index Backfile | 1930
|Cargo-handling facilities of port of bremen
Engineering Index Backfile | 1929
Modern cargo handling facilities
Engineering Index Backfile | 1937
|Cargo handling facilities at Philippines ports
Engineering Index Backfile | 1929
|