Details of control, together with spring switches, installed by Grand Trunk Western, at cost of $5000 and saving of $6000 annually, to replace interlocking and staff system on 5 1/4-mi section of single track between two ends of double track at Sedley, Ind, and Valparaiso; train movements directed by signal indications. (see also Ry Signaling v 27 n 2 Feb 1934 p 75-7 and 91)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Centralized traffic control replaces staff system on G.T.W.


    Weitere Titelangaben:

    Ry Age


    Erschienen in:

    Railway Age ; 96 , n 7


    Erscheinungsdatum :

    1934


    Format / Umfang :

    3 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch





    C.T.C. replaces staff system on Milwaukee

    Engineering Index Backfile | 1938


    C.T.C. replaces staff system on Milwaukee

    Engineering Index Backfile | 1938


    Centralized traffic control

    Kellenberger, K.E. | Engineering Index Backfile | 1932


    Centralized traffic control

    Engineering Index Backfile | 1931