Rerouting of trains and installation of spring switches reduced delays to train movements at Arlington on lines of Baltimore and Ohio; line double tracked for 4.5 mi from St George to Mariners Harbor handling both passenger and freight traffic; track and signal layout showing location of spring switches.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Spring switches solve problem on staten island lines


    Weitere Titelangaben:

    Ry Signaling


    Erschienen in:

    Erscheinungsdatum :

    1934


    Format / Umfang :

    2 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Electrification of Staten island lines

    Engineering Index Backfile | 1925


    New staten island ferries

    Engineering Index Backfile | 1938


    Passenger service on B and O Staten Island lines

    Davis, J.H. | Engineering Index Backfile | 1925


    New staten island ferries

    Engineering Index Backfile | 1938


    The Staten Island Rapid Transit

    Roess, Roger P. / Sansone, Gene | Springer Verlag | 2013