Construction of concrete highway, 4.8 mi long, for heavy hauling between railroad and dam site; road is contracted to be finished in 69 working days.
Heavy-duty concrete road to Norris dam
Eng News-Rec
Engineering News-Record ; 112 , n 8
1934
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Powerfuels for Heavy-Duty Road Transportation
Springer Verlag | 2024
|Road test: Mitsubishi EVO VIII - Drive: Norris Designs Evo VII
Kraftfahrwesen | 2003
|Road damage caused by heavy duty vehicles
Tema Archiv | 1995
|Road damage caused by heavy duty vehicles
Kraftfahrwesen | 1995
|