Cut 85 ft. deep is outstanding feature of Greenwood extension under construction; entire work envolves moving of 3,200,000 cu. yds. of earth; maximum haul is about 2 mi. and average haul about 2,400 ft.
Georgia and Florida build an extension
Earth Mover
Earth Mover ; 15 , n 5
1928
4 pages
6 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Purchasing forms used by Georgia and Florida railroad Augusta, Georgia
Engineering Index Backfile | 1947
Florida East Coast Railway extension
Engineering Index Backfile | 1907
|