Character of country; in entire line there will be 6 steel bridges and 72 timber trestles; 19 water stations planned; estimated that full expenditure will be $28,500,000, not including costs of ocean terminal port.
Work on Hudson bay railroad progressing rapidly
Eng. News-Rec
Engineering News Record ; 101 , n 2
1928
2 pages
2 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Alaska airport work progressing rapidly
Engineering Index Backfile | 1941
Hudson River tunnel railroad terminal
Engineering Index Backfile | 1892
|Engineering Index Backfile | 1901
|The Albany and Hudson railroad
Engineering Index Backfile | 1901
Construction of S. S. Malolo progressing rapidly
Engineering Index Backfile | 1925