Considerable profit made during past financial year; progress made in workshops and at dockyard; system forming Tanganyika railways consists of total of 1134 miles; carriages and wagons; workshops.
Tanganyika railways and marine department
S. African Eng
South African Engineering ; 39 , n 2
1928
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1927
Engineering Index Backfile | 1930
|New passenger rolling-stock for Tanganyika railways
Engineering Index Backfile | 1929
Reconstruction of Lukonde Bridge on Tanganyika Railways
Engineering Index Backfile | 1932
|New beyer garratt locomotives for the tanganyika railways
Engineering Index Backfile | 1931