Installation of power-operated points and signals brought into use last year and now effecting substantial economies in operation; system adopted was Westinghouse Brake and Saxby Signal Co.'s electropneumatic power signaling; signal mechanism and control; route indicators; point mechanism; locking frame; signal cabin; train description; power supply.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Temperley junction re-signalling, buenos ayres great southern railway


    Weitere Titelangaben:

    Ry. Gaz


    Erschienen in:

    Erscheinungsdatum :

    1928


    Format / Umfang :

    13 pages


    Anmerkungen:

    3 Figs.


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch







    Jubilee of the buenos ayres great southern railway

    William Ro¨ / gind | Engineering Index Backfile | 1914