First vessels to be constructed new in United States having their steam plants especially designed for use of pulverized coal fuel; will carry 7000 long tons of coal; 350 ft. long between perpendiculars; coal bunkers will be gravity feeding; propelling machinery different in each ship; superheat adopted for water-tube boilers; geared turbines for water-tube boiler ship; reciprocating engine for second vessel; coal crusher of portable type; aero-type pulverizers adopted.
Bethlehem to build first pulverized coal burning ships
Naut. Gaz
Nautical Gazette ; 115 , n 2
1928
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Arrangement of bunkers and equipment of pulverized coal burning ships
Engineering Index Backfile | 1928
|Engineering Index Backfile | 1938
|Pulverized-coal firing of ships
Engineering Index Backfile | 1929
|Pulverized-coal firing of ships
Engineering Index Backfile | 1930
|Pulverized-coal-burning steamship "berwindlea"
Engineering Index Backfile | 1929