Standard track construction 7-in. T. girder rail with 7-in. grooved girder rail for curves; standard tracks for brick paving, and for concrete paving; track on wood ties; track with grooved girder rails; methods of track reconstruction; city and company cooperation. (see also Am. City, vol. 39, no. 4, Oct. 1928, pp. 140-141, 6 figs)
Rebuilding street railway track at Cincinnati
Eng. News-Rec
Engineering News Record ; 101 , n 10
1928
3 pages
6 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Rebuilding street railway track at Cincinnati
Engineering Index Backfile | 1928
Track construction of the Cincinnati Street Railway Company
Engineering Index Backfile | 1899
Cincinnati street railway opens suburban line
Engineering Index Backfile | 1931
Shops of the Cincinnati street railway company
Engineering Index Backfile | 1897
Rebuilding a railway from the track up
Engineering Index Backfile | 1930
|