Present standards in Cologne call for use of concrete beams in paved streets; rails rest on elastic filler and are held to gage by tie rods; on reservations and on curves beams are omitted; describes features of German street-railway track construction, as exemplified in Cologne; rails have resilient support; section of track with tie rods in place, ready for side filler and paving; tie rods and paving keep rail in place.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Cologne lays tracks without ties


    Weitere Titelangaben:

    Elec. Ry. Jl


    Beteiligte:
    Schwanter, R. (Autor:in)

    Erschienen in:

    Erscheinungsdatum :

    1928


    Format / Umfang :

    3 pages


    Anmerkungen:

    17 Figs.


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :



    Track without ties

    Mall, I.O. | Engineering Index Backfile | 1930


    Wrecking crane lays cable

    Engineering Index Backfile | 1929


    Singapore lays LNG plans

    British Library Online Contents | 2006


    Road paver-finisher lays ballast

    Online Contents | 1994