This railway is highest standard-gage railway in world; survey and construction of tunnel were difficult because of broken nature of country; ventilation; details of dynamite used in different stages of work.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Tunnel construction and main line deviation on the Central Railway of Peru


    Weitere Titelangaben:

    Engineer


    Beteiligte:
    Hixson, F.F. (Autor:in)

    Erschienen in:

    Engineer ; 146 , n 3800


    Erscheinungsdatum :

    1928


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Woodhead new tunnel: Construction of three-mile main double-line railway tunnel

    Scott, P.A. / Campbell, J.I. | Engineering Index Backfile | 1954


    Woodhead new tunnel: Construction of three-mile main double-line railway tunnel

    Scott, P.A. / Campbell, J.I. | Engineering Index Backfile | 1954


    Woodhead new tunnel: Construction of three-mile main double-line railway tunnel

    Scott, P.A. / Campbell, J.I. | Engineering Index Backfile | 1954


    Railway construction in Peru

    Engineering Index Backfile | 1904


    The Central railway of Peru

    Engineering Index Backfile | 1925