It is shown that timing and programming of track maintenance work are influenced by interplay of factors which can be classified as safety of line, occupation time available, and cost; shoulder ramming tests on German Federal Railways were carried out with both on-track and offtrack equipment including Matisa-Windhoff BV and other ramming and compacting machines; rectilinear track section laid on homogenous formation, uniformly tamped and marked out into 22 lengths, was used for controlled trials; section carried daily traffic of 23,000 tons. (24408)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Practical results of crib and shoulder compaction


    Weitere Titelangaben:

    Ry Gaz


    Erschienen in:

    Railway Gazete ; 125 , n 5


    Erscheinungsdatum :

    1969


    Format / Umfang :

    2 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch




    MESH CRIB

    DACKS RACHEL / SCHAFFER IAN / VINCENT DARRELL et al. | Europäisches Patentamt | 2019

    Freier Zugriff


    Reassemblable crib

    MATSUMOTO JUNYA | Europäisches Patentamt | 2021

    Freier Zugriff

    REASSEMBLABLE CRIB

    MATSUMOTO JUNYA | Europäisches Patentamt | 2019

    Freier Zugriff

    Intelligent baby crib trolley

    CHEN XINYI / CAI XIAOJUN / HUAN YUXIANG et al. | Europäisches Patentamt | 2021

    Freier Zugriff