Aspects of economic operation of hydroelectric portion of multiple purpose projects of Bureau of Reclamation; hydroelectric plants are required to produce saleable power from head available without detriment to other purposes of project; revenue from hydroelectric power often represents payout of entire project; turbine capability at design of turbine depends on irrigation demands of project.
Multiple purpose powerplant capacity
ASCE -- Proc (J Power Div)
ASCE -- Proceedings -- Journal of the Power Division ; 85 , n PO4, Part 1
1959
15 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Emerald Group Publishing | 1971
Emerald Group Publishing | 1969
Emerald Group Publishing | 1974
Engineering Index Backfile | 1929
Engineering Index Backfile | 1960