Operations on chassis; main assembly line running through 1000-ft tunnel supplied by three main overhead conveyors; photographs.
Latest methods employed at Austin assembly plant
Automotive Industries
Automotive Industries ; 106 , n 10
1952
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1964
Engineering Index Backfile | 1935
New Technology Employed for the Latest 13B-Rotary Engine
SAE Technical Papers | 1990
|New technology employed for the latest 13B-rotary engine
Kraftfahrwesen | 1990
|Engineering Index Backfile | 1910