Project consisted of raising three west spans of 2-lane bridge over Sciota River to meet relocation of approach on new high level grade; illustration showing procedure and equipment used; traffic maintenance during construction.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Bridge raised under traffic in "flood proofing" program for Ohio River road


    Weitere Titelangaben:

    Roads Streets


    Erschienen in:

    Erscheinungsdatum :

    1951


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Ohio road construction in congested district under traffic

    Sherwood, A.W. | Engineering Index Backfile | 1928


    Flood Routing Procedure for the Lower Ohio River

    Johnson, Billy H. / Senter, Paul K. | HENRY – Bundesanstalt für Wasserbau (BAW) | 1973

    Freier Zugriff


    Condition of the Ohio post road after 10 years under traffic

    Jackson, F.H. | Engineering Index Backfile | 1925


    New Ohio river bridge at Kenova, W.Va.

    Engineering Index Backfile | 1913