Scale model layouts used by Kaiser-Frazer Corp to convert 1,300,000 sq ft of its Willow Run, Mich, plant from automobile to aircraft production in record time; steps in layout procedure; method devised for transferring locations of equipment from tables to paper; thousands of man hours and months of drawing board time saved.
Three-dimensional models slash plant lay-out time
Machy (NY)
Machinery (New York) ; 59 , n 1 ; p 207-209
1952
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Remotely controlled models slash tunnel time
NTRS | 1984
|A380 urinals to slash queuing time
Online Contents | 2008
Opel, VW To Slash Assembly Time
Online Contents | 1995
AMERICAS - US airlines slash capacity
Online Contents | 2008
Machines slash yard cleaning costs
Engineering Index Backfile | 1950