360-mi railroad to service Quebec-Labrador ore deposits is designed to carry 20 million tons annually; ruling gradient against loaded trains will be 1 in 333; 25 bridges, with 680-ft span over Moisie; 132-lb main line rails, 100-lb rails in loops and sidings; 55 diesel electric units of 1600 hp; 2400 95-ton ore cars; tentative loaded running time 14 hr; ore unloading facilities. See also Engineering Index 1951 p 982.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Quebec, North Shore and labrador railway


    Weitere Titelangaben:

    Ry Gaz


    Erschienen in:

    Railway Gazette ; 97 , n 10


    Erscheinungsdatum :

    1952


    Format / Umfang :

    2 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Muskeg and Quebec north shore and Labrador railway

    Monaghan, B.M. | Engineering Index Backfile | 1962


    Quebec, North Shore and labrador

    Hudson, G.C. / Dunn, J.H. | Engineering Index Backfile | 1954


    Location and construction of Quebec North Shore and labrador railway

    Monaghan, B.M. | Engineering Index Backfile | 1954