Factors that affected choice of location; road designed for 75 mi speed; traffic lanes are 12 ft wide and median strip is not less than 15 ft wide; there are no crossings at grade; there are two crossings of branch line railroads, two river crossings and five structures at local roads.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    High-speed dual parkway relieves Washington-Baltimore traffic congestion


    Weitere Titelangaben:

    Civ Eng (NY)


    Beteiligte:
    Spelman, H.J. (Autor:in)

    Erschienen in:

    Erscheinungsdatum :

    1948


    Format / Umfang :

    5 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch




    Slope Rehabilitation at the Baltimore-Washington Parkway with Rammed Aggregate Piers

    O'Malley, Edward S. / Saunders, Scott A. / Ecker, John J. | Transportation Research Record | 2004


    New traffic locking on C. and O. relieves congestion

    Johnson, H.E. | Engineering Index Backfile | 1921



    Reimagining Riverfront Access Along the George Washington Memorial Parkway

    Kelsch, Paul / Kris Krider, J. / La Coe, Jodi | Transportation Research Record | 2017