Line and grade revisions; yard and terminal work; bridge renewals fewer; station modernization; grade separations increase; detailed report by roads of all grade crossing work undertaken during 1947, as well as for all other construction projects completed during year, or still in progress at its close, individual cost of which approached or exceeded $100,000.
Construction volume highest since 1931
Ry Age
Railway Age ; 124 , n 1 ; p 85-94
1948
10 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Seaborne Trade: Highest Growth Since 1990
British Library Online Contents | 1996
Outlay for maintenance of way largest since 1931
Engineering Index Backfile | 1936
|US figures highest since 1995 . Thailand relaxes helicopter regulations
Online Contents | 1996
Record billings in '98 for general aviation aircraft - Deliveries highest since 1984
Online Contents | 1999
Highest possible power in racing car construction
Engineering Index Backfile | 1939
|