Examples of recent blanketing operations; experiments in lighting of railroad yards; trials being carried out with groups of high power lamps mounted in various arrangements on top of temporary tower 150 ft in height. (See also - n 4792 Nov 28 1947 p 505; Engineering v 164 n 4271 Dec 5 1947 p 546-7)
Track reconditioning and lighting on southern railway
Engineer
Engineer ; 184 , n 4793
1947
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Track reconditioning and lighting on southern railway
Engineering Index Backfile | 1947
Reconditioning railway sleepers in Australia
Engineering Index Backfile | 1925
RECONDITIONING - Reconditioning news
Online Contents | 2002
RECONDITIONING - Reconditioning News
Online Contents | 2003