Nashville, Chattanooga and St. Louis Railroad has completed installation of centralized traffic control on 86 mi of single track main line between Chattanooga, Tenn, and Cartersville, Ga, completing entire route between Bruceton and Atlanta, including 333 mi of single track and 39 mi of double track; illustrated description of installation.
C.T.C. installed on Dixie line
Ry Signaling
Railway Signaling ; 41 , n 2
1948
5 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
C.T.C. on 207 miles of Dixie Route
Engineering Index Backfile | 1945
C.T.C. on 207 miles of Dixie Route
Engineering Index Backfile | 1945
C.T.C. signaling installed on Milwaukee
Engineering Index Backfile | 1942
C.T.C. installed on Baltimore and Ohio
Engineering Index Backfile | 1934
C.T.C. installed on Norfolk and Western
Engineering Index Backfile | 1941