Rail level of Gare du Nord and Gare du Midi has had to be raised to connect with new viaduct, necessitating rebuilding of both stations; manner in which work was carried out; diagram of rebuilt Gare du Midi at platform level, and floor plan of new Gare du Nord at main entrance level, between street and platforms, presented. From Techniques des Travaux, data not specified.
Adapting Brussels terminal for junction railway
Ry Gaz
Railway Gazette ; 89 , n 11
1948
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1948
|Creation of railway junction in centre of Brussels
Engineering Index Backfile | 1949
|The metropolitan railway of Brussels
Engineering Index Backfile | 1898
Great eastern railway company's steamer "Brussels."
Engineering Index Backfile | 1903
Railway rolling stock at the Brussels exposition
Engineering Index Backfile | 1911
|