Successful trial of new air refueling technique; tanker aircraft trails 65ft fuel hose which terminates in cone containing main fuel valve; applying half flap, Meteor pilot approaches tanker and engages with cone by use of "probe" which protrudes from nose of his aircraft; within cone it is gripped by three toggles; equipment constructed by Flight Refueling Ltd. (See also Flight v 56 n 2120 Aug 11 1949 p 177-8; Aviation Week v 51 n 9 Aug 29 1949 p 18-20; Aero Digest v 59 n 4 Oct 1949 p 28, 106; Engineer v 188 n 4889 Oct 7 1949 p 408)
Meteor's 12-hour flight
Engineering
Engineering ; 168 , n 4359
1949
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1949
Engineering Index Backfile | 1949
Engineering Index Backfile | 1949
Engineering Index Backfile | 1949
FLIGHT MECHANICS OF THE 24-HOUR SATELLITE
AIAA | 1963
|