Account of post war reconstruction of Harbor: clearing work; reconstitution of cranes; reconstruction of mobile bridges, drydocks, sheds and quays; construction of 1500 m long new quay in Inner Basins. Before joint meeting Societe des Ingenieurs Civils de France and Instn Civ Engrs. (See also - discussion p 70-1)
Port of Havre after war was most badly damaged port on continent
Port of Le Havre
Dock and Harbour Authority ; 30 , n 345
1949
6 pages
Aufsatz (Zeitschrift)
Französisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1936
Engineering Index Backfile | 1908
Engineering Index Backfile | 1933
|Engineering Index Backfile | 1910
|Engineering Index Backfile | 1935
|