Illustrated description of equipment and methods used in concreting Union Pacific's new $ 8,000,000 Aspen tunnel; placing of concrete lining, now more than half complete, is final major step in construction of 6700-ft single track bore that railroad started to drill through Uinta Mountain range in Western Wyoming about 2 yr ago; tunnel parallels present single track Aspen tunnel, completed in 1901. (see also Western Construction News v 24 n 9 Sept 1949 p 84-5; Civ Eng (NY) v 19 n 9 Sept 1949 p 39)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Big tunnel-lining job fully mechanized


    Weitere Titelangaben:

    Ry Age


    Erschienen in:

    Railway Age ; 127 , n 11


    Erscheinungsdatum :

    1949


    Format / Umfang :

    3 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Mechanized lining repairing method for operating railway tunnel

    SONG DAN / LEE YI-MIN / LI SHENGYONG et al. | Europäisches Patentamt | 2024

    Freier Zugriff

    Fully mechanized cargo handling

    Bast, F. | Engineering Index Backfile | 1966


    Fully mechanized caving face equipment train

    LIU DONGLAI | Europäisches Patentamt | 2023

    Freier Zugriff

    Santa Fe rail gangs fully mechanized

    Engineering Index Backfile | 1937


    Tunnel lining tests

    Matsuda, Y. | British Library Online Contents | 2001